Structured cabling, fiber, camera systems, and closet remediation in working commercial buildings. We are in the process of collecting photos and written approval from the owners before anything goes up here, because their buildings are not ours to publish.
These are our own installs, photographed on site. We have kept the captions to what is in the frame: no invented square footages, drop counts or dollar figures, and no client named without their say-so. If you want the detail behind any of them, call and we will talk it through.
Structured cabling. Horizontal drops brought back to a single distribution point, terminated to patch panels and dressed into vertical management. Every run labeled at both ends and tested before handover.
Structured cabling →
Structured cabling. Bundles combed out, cut to length, and landed across patch panels in order, so the next person to open this rack can trace a run without pulling on anything.
Structured cabling →
Structured cabling. Patch cords cut to length and routed through horizontal management between every panel and switch. Nothing draped, nothing blocking a port, nothing blocking airflow.
Structured cabling →
Low voltage devices. Controller mounted, terminals landed and labeled, conduit run in to protect the cable where it leaves the enclosure. The access point beside it was cabled by the same crew.
Camera and access systems →
Network closet cleanup. An unmanaged closet rebuilt into an enclosed wall-mount rack: patch panels, switching, and a UPS on rails. See the before shot on the closet cleanup page.
Closet cleanup →
Office fit-out. What the cabling is actually for: drops landed at the desk, coverage overhead, and a workspace that works on the day people move in.
Structured cabling →Photos of ceiling tile all look the same anyway. Here is what actually tells you whether an install was done well, and what you should ask any contractor bidding your building.
We are happy to answer all six of those on the phone. More on how we work is on our about page, and the full scope we handle is on our services page.
Rough-in and trim sequenced against the general contractor's schedule, with sleeves and pathways coordinated before walls close. For general contractors.
Buildings full of people, where the disruptive work moves to nights and weekends and the cutover has to land before Monday morning.
Several locations built to one standard, each with its own walkthrough so no site gets scoped off an assumption from the last one.
Tell us what you are working with and we will schedule a walkthrough. You get our read on what the building needs and a scope you can hold us to.